Parsed Filings

Streaming feed of public US financial disclosures

Visit Website
January 28, 2023 MVP's take too long

I've been working, on and off, on the back-end technology for PF for almost five years. I think this is normal for engineers, so I feel I'm preaching to the choir. Design is not my forte, and the first thing I plan to do once I validate my product is invest in some good design help. I would appreciate any feedback or guidance on PF's main page.

6 Comments

  1. 2

    First thoughts:

    1. You've kept things simple, which is a good idea if you're not good at UI/UX design
    2. What's the benefit of "Parsed 10-Q/Ks, in Excel, on demand?" I'm clearly not in the target market (don't even know what a 10-Q/K is), but if I were you'd need to sell me on how it'll make my life/business better. Will it save me time and/or money? What problem does it solve? Your headline and sub-headline describe the product, but it really needs to sell the benefits. Avoiding Excel plugins doesn't sound like a big deal to me (as someone who's never used Excel plugins)

    Five years does sound like a long time. It reminds me of my first product. I read "Lean Startup," and thought that I was following its advice with creating an MVP. However, I still felt like I needed to "engineer things properly," so that I'd be able to develop it into something amazing. "Engineering things properly" took years longer than expected, after which I discovered that I'd built a "well-engineered" product that few wanted. I made other mistakes too, but was too burnt out toward the end to fix them and try again. So, I abandoned the project.

    I could've saved a lot of time by making a truly minimal prototype riddled with technical debt that I'd have to rewrite later. It sounds horrible from an engineering perspective, but I would've learnt that I had missed the mark early, and may have had enough steam to correct course. If I had found product-market fit, then rewriting would have been hard work, but worth the effort.

    1. 1

      The five years was more a hobby project, and validating whether I could deliver on the scale/platform for this. Which I can! It just took awhile.

      Thanks for your feedback on my front-page. I need to work on educating the user up-front. Any advice on "learn to build a SAAS sales" funnel type stuff? There's too much information out there and I'm overwhelmed.

      1. 1

        You're welcome. I have no advice for building SAAS sales funnels, because I've never done it myself. I'm still working on engineering my own "overnight success" (over 10 years and counting...).

        1. 1

          Makes me feel a little better about my own five-year boondoggle.

          Good luck ;)

          1. 1

            Thanks, and all the best for your project(s).

  2. 1

    I am a newbie, so don't take my opinion too seriously.

    1. It shouldn't take five years to create an MVP. Maybe you should double check if you are adding too many features.
    2. I would use a free/cheap template for the landing page. I'm not a good frontend engineer, that's why I didn't designed my landing page from scratch. My landing windmotion.io (initial version) was done from a free simple landing page I got from github and deployed easily and cheap in aws lightsail.

About

Most public filing data is normalized. Unlock all the data in corporate filings, like the pros, without spending thousands of dollars a month.